The Panama Canal is one of the most spectacular Wonders of the World and the new "Centario Panama Bridge" with lush lawns leading to and from it produced with Cypher's Dust Stop ensure erosion protection and the everlasting beauty of this magnificent structure.
Dust Stop was the material of choice for the Hydroseeding mixture that was effectively sprayed onto the entire earth surface of the new roads on both sides of this amazing bridge to highlight the overwhelming quality and vision of this great structure which was officially opened in August of 2005. This massive new innovative bridge crossing the Panama Canal was constructed in 24 months by a renowned German Conctruction Company using the very best in modern materials and design. It is 420m long incorporating a 6 lane highway with 22 km of road built in total on both sides of the bridge. Cypher International Ltd. was meticulously chosen to supply Dust Stop for the important Hydroseeding and erosion control on the access roads at each approach to this astonishing new bridge now spanning the Panama Canal.

THE NEW PANAMA CENTARIO BRIDGE
|

HYDROSEEDING OPERATOR SPRAYING DUST STOP GRASS MATERIAL
| 
DUST STOP HYDROSEEDING APPLICATION NEARING COMPLETION |
Cypher Ltd provides environmental solutions for road dust control, soil stabilization, algae reduction, wastewater remediation, road building, organic effluent treatment, algae removal, road dust suppression, organic bioremediation, wastewater treatment, bod & cod removal, and effluent odor control with environmental agricultural and infrastructure products such as Earthzyme™, Dust Stop™ and Ultrazyme™. |
|