|
|
| « Back to main menu |
April 22, 2005 - Incredible Results After Just 14 Days.
Huiyang District, Huizhou City, Guangdong Province, PRC.
This is just one more example of the amazing results achieved with EarthZyme. Accurate calibrated readings were taken at such an early stage just to prove to a local official who refused to wait for the full curing time of 28 days and this official after seeing this dramatic increase in base strength immediately ordered more roads to be treated with our products. If the results are this good after only 50% of the curing time then they will be astonishingly high after the proper cure has a chance to take effect.
| | Clegg-Hammer reading | CBR-Value |
| Untreated | 23 | 37 |
| Treated with EarthZyme after only 14 Days | 44 | 135 |
This project shows an improvement of 364% in CBR after a mere 14 Days, which is very premature since the full curing time is 28 Days and will yield much higher readings.
Note:
The CBR Value is calculated as following (Clegg-Hammer reading x Clegg-Hammer reading x 0.07)
|
|
Cypher Ltd provides environmental solutions for road dust control, soil stabilization, algae reduction, wastewater remediation, road building, organic effluent treatment, algae removal, road dust suppression, organic bioremediation, wastewater treatment, bod & cod removal, and effluent odor control with environmental agricultural and infrastructure products such as Earthzyme™, Dust Stop™ and Ultrazyme™.
|