Cypher Ltd - stabilize and advance environmental growth, aeration systems, infrastructure technologies, and developments. - Cypher International Ltd. Cypher LTD
                              
Title Image

EarthZyme at Work | EarthZyme Usage

Mine Roads | Forestry | Dams & Retention Ponds | Construction Guide



The above shows the borrow soil in a windrow to the left and then the treated soil during the compaction stage. A principal advantage is that traffic can run on the road during construction and complete application takes very little time.



These two photos show the application of the hot seal and the final finish. These four photographs show the hauling in of the material from the borrow pit, through to the application of EarthZyme and onto the compacted road bed. This follows onto a 16mm chip hot mix bitumen seal. EarthZyme develops the perfect impermeable base for chip/seal, asphalt or concrete. The EarthZyme surface can be left as is or a light surface layer of small fine aggregate may be applied as an economical wear coat.



Massive Amounts of Contaminated Dust
before the Truck Reaches the EarthZyme
Treated Road

No Dust Once the Heavy Truck Starts to
Travel on the EarthZyme Treated Road


Not only does EarthZyme result in the perfect high load bearing road but It's also dust free forever.




Copyright © 2002 Cypher International Ltd. E-mail us at: Info